Next TeardownCheck a zip

See what you have rebuilt, and the lots that look like it

Type your company name. We show the teardowns Metro permits tie to it since June 2023, then current single-family lots in open zips that resemble them.

Or pick a zip code

No owner names, mailing addresses or phone numbers, ever.

N5 km
Residential demolition permits
621
Issued
Nov 13, 2025 to Nov 12, 2026
Each dot
One Metro permit, at its address
Shading
Permits per zip, same 12 months

Tested on a window the score never saw

Top 1% parcels torn down
24of about 578 in the window
Share torn down
4%a little over
Against the base rate
21×about, for all parcels

In a held-out test window, 24 of about 578 top 1% parcels were torn down, a little over 4 percent and about 21 times the base rate. Ranked by likelihood, not a promise about any one house.

What the lookup shows you

  1. Your rebuilds

    Every demolition on Metro permits since June 2023 that we can tie to your company, with the new house permit that followed it.

  2. Your typical lot

    The lot size, year built and land share of value your rebuilds have in common, worked out from the parcel records.

  3. Zips you can still get

    Open zips with current single-family lots like those, how many, and how many rank in the top 5 percent.